Electric power industry and transportation
Electric power industry
JSC «Baskirenergo»
Expansion of Karmanovskaya Hydroelectric Power Station with steam and gas units
Total project cost — 135 000 000 USD
Required investments — 135 000 000 USD
Payback period, months — 173
Current status
There are necessary buildings, new construction areas, service lines, and power resources available.
The project's summary
The electrical power of the acting power station makes 1800 MWt. The expansion of the power station will ensure stable operation and further development of the industrial enterprises in Northwest region of Bashkortostan, and make it possible to transmite electric power to adjacent regions. The realization of the project will strengthen the balance of the republic’s power system.
State authorities, sanitary and environment protection bodies of the republic have approved the project.
JSC «Baskirenergo»
Construction of Yumagusino water reservoir and hydropower unit
Total project cost — 73 000 000 USD
Required investments — 6 100 000 USD
Payback period, months — 117
Current status
Reservoir under construction.
The project's summary
Main goals of reservoir construction are protection against flooding of cities, villages, objects of economy and agricultural lands during a high-flood and balancing region’s needs in water supply during low-level periods.
It is also planned to construct a hydroelectric station near the dam. According to experts’ evaluation, electric power deficiency in this region makes about 45 MWt. Hence, the capacity of the power station is planned to be at about 45–60 MWt.
JSC «Baskirenergo»
Reconstruction and expansion of Ufa thermal power station #3 by steam and gas modules
Total project cost — 20 000 000 USD
Required investments — 20 000 000 USD
Payback period, months — 72
Current status
There are necessary buildings, new construction areas, supply lines, and power resources available.
The project's summary
It is planned to replace out-of-date blocks that do not meet the present requirements on pollution norms. The planned electrical power of the projected block makes 72,3 MWt,thermal power — 88 Gcal/hour.
The pre-contract estimation of the necessary equipment has been made. There are offers for constructing a block of steam and gas unit, which includes a gas turbine, a boiler — utilizer, electrical equipment for the gas turbine and a unit of an automatically operated control system.
The electric power will be supplied to the consumers of the city of Ufa. As industrial production has the tendency of growth the need for electric power will increase as well.
Transportation
State Company «International airport Ufa»
Construction works are in progress.Design and budget documentation for construction of the 1st stage has been elaborated.
Total project cost — 50 000 000 USD
Required investments — 50 000 000 USD
Payback period, months — Business plan is under completion
Current status
Construction works are in progress. Design and budget documentation for construction of the 1st stage has been elaborated.
The project's summary
To increase traffic capacity of the airport for international transportations, to meet international safety and service standards it is proposed to carry out stage-by-stage reconstruction of the Ufa airport. We are working at attracting flights of leading world air carriers and transit flights to be done through our airport.
|


|